Managing a pipeline that stretches across two countries requires more than routine inspections. Operators need reliable systems to track its condition, identify potential threats and determine where maintenance is most urgently needed. This is the focus of a new procurement initiative by the East African Crude Oil Pipeline (EACOP), which is seeking digital solutions to strengthen its pipeline integrity management capabilities.
EACOP has invited expressions of interest from qualified technology providers and joint ventures to supply and implement specialised Pipeline Integrity Management Software for its Ugandan section. The contract covers approximately 296 kilometres of the pipeline and forms part of efforts to establish an integrated system for monitoring and maintaining the infrastructure.
The proposed software will combine a Pipeline Integrity Management System (PIMS) with Risk-Based Inspection (RBI) capabilities. In practical terms, this means operators will have a centralised platform for managing pipeline inspection records, assessing potential threats and determining which sections require closer attention.
Rather than treating every section of the pipeline equally, risk-based inspection helps prioritise maintenance based on the likelihood of a failure and its potential consequences. This is particularly important for long-distance pipelines, where threats such as corrosion, material deterioration and other forms of damage can compromise structural integrity if left undetected.
The platform will also incorporate Geographic Information System (GIS) technology, allowing operators to visualise pipeline assets and associated inspection data geographically. Integration with EACOP's existing maintenance management system is expected to further streamline inspection planning, maintenance activities and engineering assessments.
Supporting a Major Cross-Border Infrastructure Project
The procurement is part of the wider development of EACOP, a 1,447-kilometre heated and buried crude oil pipeline designed to transport oil from Uganda's Lake Albert region to the Port of Tanga in Tanzania. Approximately 298 kilometres of the route will pass through Uganda, with the remaining 1,149 kilometres located in Tanzania.
EACOP is pursuing a joint procurement arrangement involving companies registered in both countries, with separate contracts covering the Ugandan and Tanzanian sections. Interested companies bidding for the Ugandan contract are expected to submit their expressions of interest by November 16, 2026.
Why It Matters
The initiative reflects the growing role of digital technology in pipeline operations. As infrastructure projects become larger and more complex, operators increasingly depend on integrated data systems to improve inspection accuracy, anticipate maintenance requirements and reduce the risk of operational failures.
For EACOP, the proposed software will provide an important foundation for managing pipeline integrity across its route. It also highlights how digital engineering and data-driven maintenance are becoming essential components of modern pipeline infrastructure, extending the industry's focus beyond construction to long-term operational safety and reliability.
Author
